Industry

Technology Services

Technologies

ASP.Net | C# | jQuery | Bootstrap | SQL Server | WCF Services | IIS7.5/8.0 | HTML5 | CSS3

Client

Our client, a Fortune 500 multi-industrial corporation operating across six countries, specializes in providing engineering and technology solutions that enhance the energy and operational efficiency of buildings, vehicle batteries, electronics, and automobile interior systems. Their expertise includes building control engineering services such as HVAC, fire and security systems, energy management, and facility management.

Challenges

The client faced several challenges in their proposal generation process:

Time-Consuming Process: Sales representatives took up to two days to manually create service proposals.

Inefficient Costing: Delays in proposal generation led to difficulties in providing accurate cost estimates.

Lack of Performance Insights: No structured way to analyze proposal performance or track key metrics.

Manual Effort & High Labor Costs: Sales teams had to spend excessive time on paperwork instead of focusing on client interactions.

Limited Decision-Making Data: Absence of analytical insights made it challenging to identify profit margins and optimize services.

Solution Provided

To streamline the proposal creation process, we developed an automated proposal generation system. The solution enabled sales teams to create proposals efficiently, reducing the time required from two days to just two hours. The system was designed with multilingual support, allowing global teams to generate proposals in different languages seamlessly.

Key features of the solution included:

Seamless integration with Salesforce for better sales tracking

Interactive reports with in-depth analytical insights

Automated cost calculations to improve pricing accuracy

Compliance with strict security standards to mitigate risks

Reduction in manual effort, leading to cost savings

Results

With the implementation of the automated proposal generation system, the client experienced significant improvements:

Drastic Reduction in Proposal Creation Time – From 2 days to 2 hours

Enhanced Sales Efficiency – Sales teams could focus more on customer engagement rather than paperwork

Cost Savings – Reduced manual labor costs

Better Decision-Making – Analytical data provided valuable insights into profit margins

Improved Customer Experience – Faster and more accurate proposals led to enhanced client satisfaction

Secure & Scalable Solution – Adhered to strict security guidelines, ensuring data protection

Similar Customer Stories

ERP Solution for US-Based Construction Company’s Business Challenges

ERP Solution for US-Based Construction Company’s Business Challenges

Mitsui Home North America (MHNA) enhanced business management by implementing Dynamics 365 ERP, leading to improved efficiency and cost accuracy.

Continue Reading banner
ERP Implementation for Singapore-Based Printer Manufacturing Company

ERP Implementation for Singapore-Based Printer Manufacturing Company

A Singapore-based printer manufacturer streamlined global operations and multi-currency reporting with Synoverge's ERP implementation.

Continue Reading banner
Simplifying GST for Logistics with Dynamics 365 Solution

Simplifying GST for Logistics with Dynamics 365 Solution

Synoverge helped a logistics leader enhance GST compliance and operational efficiency by integrating Dynamics 365 Business Central into their system.

Continue Reading banner